utilities
Steam
Electricity
Bushy Park received electricity from Dominion Energy through a single 115kV transmission line. The power is reduced to 13.8kV and provided to customers through a dual-fed system at 480V and 2400V.
Process Water
Bushy Park is permitted to draw up to 100MGD from the Back River. The current system design allows for a capacity of 7.1MGD. This current capacity meets all site needs but could be expanded if needed. The minimum pressure supplies is 70PSI.
Nitrogen
Bushy Park’s Nitrogen gas system includes bulk liquid nitrogen storage tanks with atmospheric steam evaporators that provide nitrogen gas sufficient to meet plant demands.
Wastewater
The wastewater treatment facility at Bushy Park is an above ground aerobic, activated sludge treatment system consisting of equalization, neutralization, primary treatment, biological treatment, and sludge dewatering. The system is designed with a significant amount of flexibility in dealing with abnormal events.
Natural Gas
Bushy Park is supplied natural gas by Carolina Gas and Transmission and Dominion Energy of South Carolina. Bushy Park has the capacity to provide up to 20,000 dT/day of natural gas.
Refrigeration
Stormwater Management
Compressed Air
Bushy Park maintains compressed air capacity of 8,000 scfm. The compressed air system has a priority air valve.
services
Security
Emergency Response
Occupational Health
Occupational Safety
Storeroom
Maintenance
logistics
Port
Bushy Park is located within 30 minutes of all Charleston, SC port terminals. Charleston’s port is the most productive port and fastest-growing in North America. With the deepest harbor in the south Atlantic, Charleston is the only port in the southeastern United States efficiently handling fully loaded Panamax Vessels.
Onsite Water Access
Major Interstates
Onsite Railway
An existing loop track serviced by CSX is located at the Dominion Energy Power Station on the northern boundary of Bushy Park. A two-mile rail spur extends into Bushy Park with all onsite rail movements being conducted by highly trained Bushy Park personnel for onsite customers. Bushy Park has plans to further expand its rail capability in the near future.
International Airport
support
Permit Assistance
Technical Consulting
Local Relationships
Business Incentives
With business-friendly incentives provided by the state of South Carolina and Berkeley County, companies locating at Bushy Park can reduce their operating costs thereby improving their ROI. Bushy Park offers the right advantages for business success.
workforce
Talent Pool
Education
Training
lifestyle
Beaches & Rivers
World-Class Restaurants
Arts, Culture & Entertainment
Night Life
History
utilities

Steam

Electricity
Bushy Park received electricity from Dominion Energy through a single 115kV transmission line. The power is reduced to 13.8kV and provided to customers through a dual-fed system at 480V and 2400V.

Process Water
Bushy Park is permitted to draw up to 100MGD from the Back River. The current system design allows for a capacity of 7.1MGD. This current capacity meets all site needs but could be expanded if needed. The minimum pressure supplies is 70PSI.

Nitrogen
Bushy Park’s Nitrogen gas system includes bulk liquid nitrogen storage tanks with atmospheric steam evaporators that provide nitrogen gas sufficient to meet plant demands.

Wastewater
The wastewater treatment facility at Bushy Park is an above ground aerobic, activated sludge treatment system consisting of equalization, neutralization, primary treatment, biological treatment, and sludge dewatering. The system is designed with a significant amount of flexibility in dealing with abnormal events.

Natural Gas
Bushy Park is supplied natural gas by Carolina Gas and Transmission and Dominion Energy of South Carolina. Bushy Park has the capacity to provide up to 20,000 dT/day of natural gas.

Refrigeration

Stormwater Management

Compressed Air
Bushy Park maintains compressed air capacity of 8,000 scfm. The compressed air system has a priority air valve.
services

Security

Emergency Response

Occupational Health

Occupational Safety

Storeroom

Maintenance
logistics

Port
Bushy Park is located within 30 minutes of all Charleston, SC port terminals. Charleston’s port is the most productive port and fastest-growing in North America. With the deepest harbor in the south Atlantic, Charleston is the only port in the southeastern United States efficiently handling fully loaded Panamax Vessels.

Onsite Water Access

Major Interstates

Onsite Railway
An existing loop track serviced by CSX is located at the Dominion Energy Power Station on the northern boundary of Bushy Park. A two-mile rail spur extends into Bushy Park with all onsite rail movements being conducted by highly trained Bushy Park personnel for onsite customers. Bushy Park has plans to further expand its rail capability in the near future.

International Airport
support

Permit Assistance

Technical Consulting

Local Relationships

Business Incentives
With business-friendly incentives provided by the state of South Carolina and Berkeley County, companies locating at Bushy Park can reduce their operating costs thereby improving their ROI. Bushy Park offers the right advantages for business success.
workforce

Talent Pool

Education

Training
lifestyle

Beaches & Rivers

World-Class Restaurants

Arts, Culture & Entertainment

Night Life

History
THE BUSHY PARK ADVANTAGE
Don’t build what we’ve already built. Bushy Park’s existing heavy infrastructure eliminates the need for you to invest millions in steam generation, wastewater treatment, process water systems, and more. Convert capital expenditure to operating expense while accelerating your speed to market
Land Disturbance Permit
Site to Production
Deep Water Barge Access
Rail Access
Steam Generation
Process Water System
Wastewater Treatment
Refrigeration
Emergency Services
TRADITIONAL SITE DEVELOPMENT
- Navigate process on your own
12-18 months typical
- Build infrastructure, then facility
36+ months typical
- Find suitable waterfront site
Extremely limited availability in Southeast
- Negotiate & construct spur
12-24 months construction
- Design, permit, construct
Significant capital investment required
- Build intake & distribution
12-36 months construction timeline
- Design, permit, & construct facility
24-48 months construction
- Design & install system
Additional construction time & expense
- Rely on county EMS
Extended unknown response times
BUSHY PARK
- Expert team support
Recent example: 6 months
- Infrastructure ready now
Recent example: 18 months total
- Cooper River barge slip
On-site deep water access for heavy loads
- On-site CSX rail loop
2-mile spur, trained operators
- Capacity Available
400K lbs/hr capacity available
- Immediate access
7.1MGD capacity, expandable to 100MGD
- On-site facility operational
Flexible treatment capacity
- Operational system
1,500 tons cooling capacity
- On-site emergency team
4-minute average response time
NEED SPECIFICATIONS
FOR YOUR UNIQUE REQUIREMENTS?
Our engineering team can provide detailed technical specifications tailored to your exact utility needs, flow rates, and capacity requirements.